Rural Water Trust · Janjanbureh, Central River Region, The Gambia · 2024
Central River Community Water Programme
12 community boreholes delivering clean water to over 9,000 people.
12Boreholes
9,000+People served
2.1 L/sAvg. yield
The challenge
Dispersed villages with variable geology and no existing water infrastructure required reliable siting and consistent yields.
Our solution
Our team ran geophysical surveys, drilled with the DR-500, and installed solar-powered pumps at each site.
The outcome
12 productive boreholes commissioned in 14 weeks, each with a completion report and community training.